Sealed Bids from qualified Contractors will be received by the Paulding County Board of
Commissioners (also referred to as Owner) for Paulding SR 92 Hiram Sewer Extension.
The Work includes the installation of approximately 3740 linear feet of 12 inch and 800 feet
of 8 inch DIP sewer main, 322 feet of jack and bored 15 inch casing under SR92 for 8 inch
DIP sewer main, 148 feet of 21 inch casing at creek crossings, 265 vf of manholes, a
connection to existing manhole, asphalt pavement patching, installation and maintenance of
erosion control measures, traffic control, permanent grassing and other related work. The
contractor will furnish all materials and perform all work associated with the project.