Gym Floor Replacement
Agency: | State Government of Georgia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD10980610138931787 |
Posted Date: | Jan 10, 2024 |
Due Date: | Feb 9, 2024 |
Solicitation No: | PE-55612-NONST-2024-000000002 |
Source: | https://ssl.doas.state.ga.us/g... |
BULLOCH BOARD OF EDUCATIONBuyer Contact:
Ryan Macy
rtmacy@bullochschools.org
912-212-8651
Description
Base Bid
The scope of work includes the replacement of existing Onmisports flooring. Replace existing urethane pad underlay as necessary. Ensure an even transition between replacement flooring remaining/existing flooring, including basketball courts, offices, hallways, etc. Color match to existing golden maple game floor and replace approximately 114¿ x 25¿ sections of flooring under each set of bleachers with Omnisports HPL (home and visitor sides, two sections per school). The replacement floor shall be seamed to the existing floor at the basketball court sideline.
Remove existing retractable bleachers and reinstall.
Paint game lines on replacement flooring to match all existing lines at William James Middle School and Langston Chapel Middle School. Paint game lines on replacement flooring and all existing game lines, including school logo at center court at South East Bulloch Middle School. Game lines may exist that are for sports other than basketball.
Replace existing cove base
Alternate No. 1
The scope of work includes the replacement existing of Onmisports flooring. Replace existing urethane pad underlay as necessary. Ensure an even transition between replacement flooring remaining/existing flooring, including basketball courts, offices, hallways, etc. Replace existing flooring to the basketball court sidelines and end lines with Omnisports HPL in a color selected by owner (colors may vary by school). Approximately 6700 sq. ft. / school. Alternate 1 includes replacement of all flooring in each gym with the exception of the existing basketball court flooring. The replacement floor shall be seamed to the existing floor at the basketball court sideline and end lines.
Remove existing retractable bleachers and reinstall.
Paint court lines on replacement flooring to match all existing lines at William James Middle School and Langston Chapel Middle School. Paint court lines on replacement flooring and all existing game lines, including school logo
Code | Description |
90966 | Maintenance and Repair, Educational Building |
91025 | Flooring Maintenance and Repair, Including Refinishing and Sealing Services |
91444 | Flooring |
36020 | Floor Covering, Seamless, All Types |
36055 | Sheet Rubber, Floor |
36060 | Special Flooring, Industrial: Resinous, Elastomeric Liquid, etc. |
36056 | Sheet Vinyl, Cushioned |
36028 | Non-slip Floor Coverings: Mats, Rolls, Strips, etc. |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.