QUARLES WATER TREATMENT PLANT 2 SCADA REPLACEMENT
Agency: | State Government of Georgia |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD10980209538552690 |
Posted Date: | Dec 22, 2022 |
Due Date: | Feb 2, 2023 |
Solicitation No: | MDJ-9843 |
Source: | https://ssl.doas.state.ga.us/g... |
Lance Buchanan
lbuchanan@ccmwa.org
7705145220
Description
The Project includes, but is not limited to, the following major elements:
1. Project Overview
a. Modernize the SCADA network and create a campus wide control system.
b. Upgrade the 480VAC motor control systems at the Quarles Plant 2 Main Plant and the Raw Water Pump Stations.
2. Description of Work
a. Existing Motor Control Centers (MCCs) in the Quarles Plant 2 will be replaced with intelligent MCCs that will provide remote start/stop controls and monitoring at the plant SCADA system via Ethernet. The new MCCs will also include arc flash hazard mitigation to reduce the incident energy resulting in a safe installation for plant personnel.
b. Centralized UPS systems will be provided in several buildings.
c. New raceways (conduits and cable trays) and wiring will be provided between process equipment/instrumentation and the new MCCs and LCPs.
d. A new electrical building will be provided for the residuals area. New electrical rooms will also be provided in the Filters and Chemical buildings.
e. New fiber optic ductbanks will be installed in portions of the site and new single-mode fiber optic cables will be installed in existing empty conduits.
f. The replacement work will be sequenced as required and temporary power will be provided to keep the plant operational during construction.
g. The existing treatment facility will be required to remain in service during construction.
**Please see attachment for more details**