The work consists of furnishing and installing all materials, labor, tools, equipment, and related services required for a complete project. This project includes but is not limited to the erosion and sediment control, traffic control including detour plan and signage, roadway and stormwater demolition, utility relocation and improvements of potable water distribution and sanitary sewer collection systems, grading, installation of multiple new precast stormwater box culverts and related infrastructure, reconstruction of roadway sidewalks and related structures, and all related appurtenances that are required by the Contract Drawing and these Contract Documents and Technical Specifications within the project limits.
Inquiries may be directed to Michael Klahr, Director of Engineering by
email
or
phone
.