The objective of the Project is to renovate the Bishop Park Pool facility to extend the life and usefulness
of the facility located at 705 Sunset Ave, Athens, GA. Renovation will not require hazardous material
abatement prior to any construction activities. Materials at the building site have tested and identified no
hazardous material. The Hazardous Material Report is included in the RFP documents. The demolition
phase requires selective removal of plumbing, mechanical, electrical, flooring, and non-load bearing
walls, existing buildings, concrete decking, and pool. The construction phase will require the installation
of but not limited to new plumbing, mechanical, electrical, pool related chemical feed systems, ADA
access ramps, interior/exterior building renovations, new pump house, retaining walls, pool
commissioning & start-up, perimeter fencing, and site work. Special care shall be considered during this
project because the construction area is located in a public park that will remain open during
construction.
Bishop Park Pool was commissioned in 1977 and provides various aquatic activities for residents from
May to the end of July. Various upgrades and repairs have been performed on the pool over the years
but has reached the end of its service life. Additionally, it is reported that the pool losses approximately
10,000 – 15,000 gallons a day while in operation.