Dust Collector
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159813365933441 |
Posted Date: | Nov 30, 2023 |
Due Date: | Dec 7, 2023 |
Source: | https://sam.gov/opp/ed4385ac12... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Nov 30, 2023 01:40 pm EST
- Original Response Date: Dec 07, 2023 11:00 am EST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Dec 22, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 4460 - AIR PURIFICATION EQUIPMENT
-
NAICS Code:
- 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
-
Place of Performance:
Moody AFB , GA 31699USA
Moody AFB is seeking potential sources capable of providing the following equipment listed. Firms that respond shall provide clear evidence that they can meet or exceed the specifications. Brand name or equal
This work would be a full replacement of the dust collector system to include a combustible dust and fire protection management system that meets current NFPA guidelines. All existing duct work must be replaced and redesigned to be efficient when collecting dust. This will also require the removal and disposal of the old unit and duct work and installation of all new equipment.
Dust Collector Requirements
- All welded minimum 7 gauge mild steel construction
- Exterior surface painted to withstand exterior temperatures
- Leg support to provide minimum 48” clearance to provide area for dust collecting
- Standard inlet, minimum 17” diameter flanged
- Steep hopper with access cover, minimum 60-degree, single outlet discharge flange to match rotary valve
- Top mounted explosion vent with weather cover and burst indicator
- Side mounted sprinkler coupling with head
- Side mounted blower flange
- Ground test documentation
- Inclined Exhaust Fan, minimum 70 dBA at 3ft, 40HP, 3/60/208V, TEFC motor
- Rotary Valve, 14-18”, 1HP, 208V, NFPA 69 compliant
- Electric control panel, NEMA 12 enclosure, 40HP, 208V variable frequency drive for main blower
- Shipping of All Items/Supplies
- Installation of all Components
- All Equipment Rentals Relevant to Installation Process
3.2 Ductwork
- Galvanized steel construction, quick-fit, clamp together and angle ring flanged
The purpose of this post is seeking sources for market research purposes and no contract or obligation from the government will come of it. Please submit all information to nasir.smith.1@us.af.mil, if you have any questions you can email or call at 229-257-2084
- ADMIN ONLY NO REQTN CP 229 257 2737 4380 B ALABAMA RD BLDG 932
- MOODY AFB , GA 31699-1700
- USA
- Nasir Smith
- nasir.smith.1@us.af.mil
- Phone Number 229-257-2084
- Nov 30, 2023 01:40 pm ESTSources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.