Grassy Pond- Dock
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159175163833353 |
Posted Date: | Jan 26, 2024 |
Due Date: | Feb 21, 2024 |
Source: | https://sam.gov/opp/8686ec1d6b... |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Jan 26, 2024 01:06 pm EST
- Original Date Offers Due: Feb 21, 2024 11:00 am EST
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Mar 07, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 1945 - PONTOONS AND FLOATING DOCKS
-
NAICS Code:
- 332312 - Fabricated Structural Metal Manufacturing
-
Place of Performance:
Lake Park , GA 31636USA
Grassy Pond currently has a floating dock on Lott's Pond that is damaged due to Hurricane Idalia and needs to be replaced. The dock is fully detached from the shore and has no pilings keeping it in place.
All sizing of equipment must be similar or equal
23d FSS requires the full replacement of a floating dock on Lott's Pond.
• 1 T-shaped Dock Floating Dock
- All of the framework and handrails will be galvanized steel, a composite deck, and a poly float.
Handrails = 1-1/4" Sch 40 Pipe (1-5/8" OD) with a .140" Wall Thickness Made of Galvanized Steel
Handrails to Encompass Entire Floating Dock Including Entry Way
- 80' Walkway with 10' entry ramp = 90'
Entry Ramp to be secured to the shore with 2 EA 3" Sch 40 Pilings embedded 6' into the ground and include non-slip
- "T" is 10' x 60' (6 EA 5' x 20' sections oriented in a 2 x 3 grid)
- Pilings = 8 EA (3" Sch 40 Galvanized Steel)
6' Minimum Embedded + Depth of the Water + 3' Out of Water
Pilings are to be Hollow in the Middle
Round out Sharp Edges
Drive in the Pilings
- Custom Galvanized Steel Slide Brackets for Pilings = 8 EA
• Must Include:
- All required equipment, tools, materials, including but not limited to aquatic vehicles, storage for materials, forklifts, cranes,
- Fees to obtain any relative permits (i.e. Dig permits)
- All required demolition including concrete/curbing/poles/rods
- Removal of all waste/previously used materials including but not limited to removal of the current floating dock at Lott's Pond
- All required construction to include but not limited to pilings/footers and assembly of the floating dock
- All required transportation/travel
Standard 1-year warranty to be provided by Contractor.
Deliver to 5360 Grassy Pond Rd , Lake Park, GA 31636
- ADMIN ONLY NO REQTN CP 229 257 2737 4380 B ALABAMA RD BLDG 932
- MOODY AFB , GA 31699-1700
- USA
- Nasir Smith
- nasir.smith.1@us.af.mil
- Phone Number 2292572084
- Jan 26, 2024 01:06 pm ESTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.