Description:
|
The successful Bidder shall provide all skill; labor, material, and equipment for the widening of Canal Road from the George McDavid intersection to near Glynco Parkway. The work will require construction of milling/removal of asphalt and base, traffic control, Erosion and Sediment Control, installation of storm infrastructure, backfill, new road foundation, paving/repaving, sidewalk installation, traffic signal re-configuration, and stabilizing. All work shall be in accordance with the construction drawings and technical Specifications, if any. All material shall conform to the specifications contained in the Technical Specifications if any.
|
Publication Date/Time:
|
11/30/2022 8:30 AM
|
Closing Date/Time:
|
1/4/2023 1:30 PM
|
Pre-bid Meeting:
|
12/14/2022
|
Qualifications:
|
THIS PROJECT QUALIFIES AS A “HORIZONTAL PROJECT” (SEE QUESTION #8 IN THE PRE-QUALIFICATION PACKET CONCERNING ROAD, DRAINAGE, AND BRIDGE PROJECTS.
|
|