Modified Conex Storage Containers
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159350639108787 |
Posted Date: | Oct 21, 2022 |
Due Date: | Nov 3, 2022 |
Solicitation No: | F3QCCM2210A001 |
Source: | https://sam.gov/opp/85bef03a05... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Updated Published Date: Oct 21, 2022 01:53 pm EDT
- Original Published Date: Aug 15, 2022 11:51 am EDT
- Updated Date Offers Due: Nov 03, 2022 02:00 pm EDT
- Original Date Offers Due: Aug 30, 2022 01:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Nov 18, 2022
- Original Inactive Date: Sep 04, 2022
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 8150 - FREIGHT CONTAINERS
-
NAICS Code:
- 332311 - Prefabricated Metal Building and Component Manufacturing
-
Place of Performance:
Warner Robins , GA 31098USA
The Contractor shall provide all labor, tools, materials, parts, hardware, equipment,
travel, and delivery for quantity five (5) each “new condition/one trip” 40 Ft. Conex Storage
Containers or better (categorized as Conex: 1A, 1B, 3A, 3B, 3C) that shall be “repurposed” to
construct one (1) each Multi-Container Building (Conex 1A/1B) and three (3) each Roll-Up Door
(RUD) Storage Units (Conex 3A/3B/3C). The Conex structural modifications and associated
options/accessories shall include, but, not limited to the following custom interior/exterior options, as
applicable: roll-up or standard doors, flooring, walls, windows, insulation, paint, electrical/ lighting,
vents, and/or packaged terminal air conditioners (PTAC). In addition, these units shall include the
shrink wrap protection, flatbed delivery, post-delivery on-site blocking and leveling, any clean
up/waste disposal, and twelve (12)-month warranty coverage. The Multi-Container Building will
have climate control capabilities and provide dual roles to accommodate a Tool Storage Space and a
temporary Personnel Temp Station —positioned at the F-15 Purge Station Tent. The remaining three
(3) containers will be Roll-Up Door (RUD) Storage Units which will vented storage space for PDM
kits—positioned outside of Bldg. 131. These modified storage containers will be utilized to support
the 402d Aircraft Maintenance Group (AMXG) for a Period of Performance of 12 Months ARO and
in accordance with the attached PD dated 26 July 2022 to Robins Air Force Base, Georgia.
- CP 478 926 7509 235 PERRY ST BLDG 255
- ROBINS AFB , GA 31098-1672
- USA
- Tarmeka Battle
- Tarmeka.Battle@us.af.mil
- Jesse Schwarztrauber
- jesse.schwarztrauber.1@us.af.mil
- Oct 21, 2022 01:53 pm EDTSolicitation (Updated)
- Oct 20, 2022 04:16 pm EDT Solicitation (Updated)
- Oct 06, 2022 11:34 am EDT Solicitation (Updated)
- Oct 06, 2022 11:32 am EDT Solicitation (Updated)
- Oct 03, 2022 02:01 pm EDT Solicitation (Updated)
- Sep 21, 2022 01:32 pm EDT Solicitation (Updated)
- Sep 21, 2022 01:24 pm EDT Solicitation (Updated)
- Sep 07, 2022 04:04 pm EDT Solicitation (Updated)
- Sep 07, 2022 03:35 pm EDT Solicitation (Updated)
- Sep 04, 2022 11:55 pm EDT Solicitation (Inactive)
- Aug 29, 2022 02:29 pm EDT Solicitation (Updated)
- Aug 19, 2022 10:55 am EDT Solicitation (Updated)
- Aug 15, 2022 11:51 am EDT Solicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.